Canceled - Build - Cliff Cave - Trail Building Day 04-24-21

 Registration is closed for this event

Cancelled due to Rain

Date: Saturday, April 24, 2021 - 9am - 1pm

Location: Cliff Cave Park

Build Plans:  We will be building 2 bermed turns on the Bluff Trail loop, as well as working on the creek crossing on the connector trail.

COVID-19 & Trailbuilding: As most trail crews are small, working outside of normal exposure to the public, trail building is an inherently “socially isolated” activity. GORC believes that utilizing best practices in maintaining a hygienic and safe work site can minimize the potential of exposure to COVID-19 for volunteers and the general public.  We will require all volunteers to maintain a physical distance of 6' while working.  If that is not possible, a mask will be required.  If you feel sick or have been exposed to someone who has recently been diagnosed with COVID-19, please stay home.  We will look forward to seeing you at a future trail build.

Directions: From I 255, take Telegraph rd south approx. 1.5  mile to a left on Cliff Cave Rd. Follow Cliff Cave Rd approximately 1.25mi into the park. Meet at the parking lot at the top of the hill - it will be the first lot on the left.

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail.

Lunch will be provided by St. Louis County Parks.

If you haven't been to Cliff Cave recently or have yet to explore the trails, this may be a great opportunity to experience all that the trail system has to offer.

Weather and trail conditions providing, bring your bike for a post build ride.

See Who's Already Registered

When
April 24th, 2021 9:00 AM through  1:00 PM
Location
Cliff Cave - Upper Parking Lot
St. Louis, MO
Show large map

Riding Freeze-Thaw Trails

Current Membership Count

Individual 298
Family 87
Lifetime 60
Business 2
Total Memberships: 447

2024 Volunteer Hours

Cliff Cave: 47
Matson Hill: 39
Creve Coeur Lake: 27
Greensfelder: 16
Klondike: 6
Quail Ridge: 4
Al Foster Memorial Trail: 3
Lost Valley: 3
SIUE: 1

2024 Volunteer Hours by Type

Trail Maintenance: 88
Meeting: 48
Trail Construction: 36
Sawyer/Swamper: 15
Trail Design: 14
Project Administration: 2