Build - Greensfelder - Fall '17 Trail Building Day #3

 Registration is closed for this event

Date: November 18, 2017 - 9am - 1pm

Location: Greensfelder County Park

What: We will continue where we left off building the half-mile Scenic Overlook Connector trail. It will connect the Scenic Overlook with Eagle Valley using a portion of the Beulah trail. The intersection will be within the vicinity of Split Rock and descend down to the intersection of Eagle Valley and North Green Rock. The connector will create a variety singletrack looping options.

Where: Greensfelder Park, Allenton Rd. behind Six Flags. NOTE: Park at the Beulah Shelter located about a half mile down Scenic Loop Road - the road inside the park.

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail.

Lunch will be provided by GORC

See who's already registered

Trail Concept - Scenic Overlook Connector

 

Download the Schedule as a PDF

Download the Schedule as a Quarter Sheet PDF

Fall 2017 Trail Building Schedule

 

 

When
November 18th, 2017 9:00 AM through  1:00 PM
Location
Greensfelder Park- Beulah Shelter
Eureka, MO
Show large map

Bluff View Bike Park Campaign

-- placeholder --

Current Membership Count

Individual 412
Family 115
Lifetime 60
Business 2
Total Memberships: 589

2021 Volunteer Hours

Bluff View: 1,093
Matson Hill: 625
Greensfelder: 546
Cliff Cave: 427
Klondike: 415
Eureka MTB Park: 285
Chubb Trail: 245
Lost Valley: 175
SIUE: 39
Creve Coeur Lake: 27
Rock Hollow: 18
Castlewood State Park: 12
OT - North Trace: 9
Shepherd Mountain: 7
Indian Camp Creek: 4
Broemmelsiek: 3

2021 Volunteer Hours by Type

Trail Construction: 2,986
Trail Maintenance: 751
Sawyer/Swamper: 128
General Administration: 103
Project Administration: 58
Trail Design: 55
Ride Guide: 9

Follow Us

Twitter Feed