Build - Greensfelder - Trail Building Day 10-08-22

 Registration is closed for this event

Date: Saturday, October 8, 2022 - 9am - 1pm

Location: Greensfelder Park, MUCKERMAN SHELTER

Build Plans: We will be revitalizing the Dogwood loop including the long, steep climb out of the valley. At this trail build we will be building to short reroutes to get the trail aligned for the redesigned climb out of the valley. We will also be closing and reclaiming the old dogwood trail tread.

COVID-19 & Trailbuilding: As most trail crews are small, working outside of normal exposure to the public, trail building is an inherently “socially isolated” activity. GORC believes that utilizing best practices in maintaining a hygienic and safe work site can minimize the potential of exposure to COVID-19 for volunteers and the general public.  We will require all volunteers to maintain a physical distance of 6' while working.  If that is not possible, a mask will be required.  If you feel sick or have been exposed to someone who has recently been diagnosed with COVID-19, please stay home.  We will look forward to seeing you at a future trail build.

Directions: Greensfelder Park, Allenton Rd. behind Six Flags. Park at Muckerman shelter on the west side of Allenton Road and Hencken Road.

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail.

Lunch will be provided.

See Who's Already Signed Up

Download the Schedule as a PDF

Download the Schedule as a Quarter Sheet PDF

When
October 8th, 2022 9:00 AM through  1:00 PM
Location
Greensfelder Park - Visitor Center Lot
Eureka, MO
Show large map

Current Membership Count

Individual 314
Family 102
Lifetime 60
Business 5
Total Memberships: 481

2023 Volunteer Hours

Cliff Cave: 758
Bluff View: 548
Castlewood State Park: 286
Maramec Spring: 248
Greensfelder: 236
Matson Hill: 120
SIUE: 78
Missouri Bluffs: 29
Klondike: 26
Chubb Trail: 15
Eureka MTB Park: 7
OT - Council Bluff: 4
Creve Coeur Lake: 3
Broemmelsiek: 3
Indian Camp Creek: 2
Rock Hollow: 2

2023 Volunteer Hours by Type

Trail Construction: 1,876
Trail Maintenance: 341
Trail Design: 105
Meeting: 66
Sawyer/Swamper: 66
Project Administration: 12
General Administration: 9