Build - Klondike - Trail Building Day 12-11-21

 Registration is closed for this event

Date: Saturday, December 11, 2021 - 9am - 1pm

Location: Klondike Park

Build Plans: We will be working on extending Hogsback from the lower trailhead up to the conference center parking lot.

COVID-19 & Trailbuilding: As most trail crews are small, working outside of normal exposure to the public, trail building is an inherently “socially isolated” activity. GORC believes that utilizing best practices in maintaining a hygienic and safe work site can minimize the potential of exposure to COVID-19 for volunteers and the general public.  We will require all volunteers to maintain a physical distance of 6' while working.  If that is not possible, a mask will be required.  If you feel sick or have been exposed to someone who has recently been diagnosed with COVID-19, please stay home.  We will look forward to seeing you at a future trail build.

Directions:

Klondike Park, St. Charles, MO.

On Saturday, we are going to meet at the conference center. Enter the park and go straight up the hill.

Take Highway 94 South approximately 14 miles, past Defiance and Matson. The park entrance is on the left side of Highway 94.

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail.

Lunch will be provided.

See Who's Already Signed Up

Download the Schedule as a PDF

Download the Schedule as a Quarter Sheet PDF

When
December 11th, 2021 9:00 AM through  1:00 PM
Location
Klondike Park - Shower Lot
Augusta, MO 63332
Show large map

Riding Freeze-Thaw Trails

Bluff View Bike Park Campaign

-- placeholder --

Current Membership Count

Individual 337
Family 105
Lifetime 60
Business 2
Total Memberships: 504

2022 Volunteer Hours

Cliff Cave: 892
Greensfelder: 749
Creve Coeur Lake: 611
Bluff View: 577
Klondike: 472
Matson Hill: 285
Quail Ridge: 268
Castlewood State Park: 142
Steelville MTB Park: 140
Lost Valley: 81
Chubb Trail: 65
Eureka MTB Park: 45
OT - North Trace: 27
SIUE: 27
Indian Camp Creek: 16
Rock Hollow: 10
Broemmelsiek: 3
OT - Middle Fork: 2

2022 Volunteer Hours by Type

Trail Maintenance: 2,242
Trail Construction: 1,976
Meeting: 228
Sawyer/Swamper: 107
Trail Design: 80
General Administration: 24
Ride Guide: 13
Project Administration: 12