Build - Klondike - Trail Building Day 12-11-21

Date: Saturday, December 11, 2021 - 9am - 1pm

Location: Klondike Park

Build Plans: We will be working on extending Hogsback from the lower trailhead up to the conference center parking lot.

COVID-19 & Trailbuilding: As most trail crews are small, working outside of normal exposure to the public, trail building is an inherently “socially isolated” activity. GORC believes that utilizing best practices in maintaining a hygienic and safe work site can minimize the potential of exposure to COVID-19 for volunteers and the general public.  We will require all volunteers to maintain a physical distance of 6' while working.  If that is not possible, a mask will be required.  If you feel sick or have been exposed to someone who has recently been diagnosed with COVID-19, please stay home.  We will look forward to seeing you at a future trail build.

Directions:

Klondike Park, St. Charles, MO.

On Saturday, we are going to meet at the conference center. Enter the park and go straight up the hill.

Take Highway 94 South approximately 14 miles, past Defiance and Matson. The park entrance is on the left side of Highway 94.

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail.

Lunch will be provided.

See Who's Already Signed Up

Download the Schedule as a PDF

Download the Schedule as a Quarter Sheet PDF

When
December 11th, 2021 9:00 AM through  1:00 PM
Location
Klondike Park - Shower Lot
Augusta, MO 63332
Show large map

Bluff View Bike Park Campaign

-- placeholder --

Current Membership Count

Individual 400
Family 112
Lifetime 60
Business 2
Total Memberships: 574

2021 Volunteer Hours

Bluff View: 2,266
Matson Hill: 1,213
Greensfelder: 847
Cliff Cave: 744
Klondike: 592
Eureka MTB Park: 326
Chubb Trail: 249
Lost Valley: 195
Castlewood State Park: 157
Creve Coeur Lake: 70
SIUE: 57
Rock Hollow: 33
Broemmelsiek: 24
Shepherd Mountain: 10
OT - Council Bluff: 10
OT - North Trace: 9
Indian Camp Creek: 7
Al Foster Memorial Trail: 1
OT - Berryman Trail: 1

2021 Volunteer Hours by Type

Trail Construction: 5,143
Trail Maintenance: 1,292
Sawyer/Swamper: 241
Project Administration: 116
Trail Design: 106
General Administration: 94
Meeting: 66
Ride Guide: 27