Build - SIUE - Trail Building Day 12-04-21

 Registration is closed for this event

Date: Saturday, December 4, 2021 - 9am - 1pm

Location: SIUE

Build Plans: We have 5 projects lined up for this Saturday and some additional smaller tasks if we get a larger group. Lunch will be provided and the weather FORECAST looks good for Saturday. Please come out and give the trails some much needed TLC.

Where: We will meet in the RC field at SIUE and and head out to Trail 3 from there.

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail.

Weather permitting there may be a group ride afterwards so bring your bike!

COVID-19 & Trailbuilding: As most trail crews are small, working outside of normal exposure to the public, trail building is an inherently “socially isolated” activity. GORC believes that utilizing best practices in maintaining a hygienic and safe work site can minimize the potential of exposure to COVID-19 for volunteers and the general public.  We will require all volunteers to maintain a physical distance of 6' while working.  If that is not possible, a mask will be required.  If you feel sick or have been exposed to someone who has recently been diagnosed with COVID-19, please stay home.  We will look forward to seeing you at a future trail build.

See Who's Already Signed Up

 

Download the Schedule as a PDF

Download the Schedule as a Quarter Sheet PDF

When
December 4th, 2021 9:00 AM through  1:00 PM
Location
SIUE Cross Country Trail
Southern Illinois University Edwardsville
Edwardsville, IL 62025
Show large map

Riding Freeze-Thaw Trails

Bluff View Bike Park Campaign

-- placeholder --

Current Membership Count

Individual 337
Family 105
Lifetime 60
Business 2
Total Memberships: 504

2022 Volunteer Hours

Cliff Cave: 892
Greensfelder: 749
Creve Coeur Lake: 611
Bluff View: 577
Klondike: 472
Matson Hill: 285
Quail Ridge: 268
Castlewood State Park: 142
Steelville MTB Park: 140
Lost Valley: 81
Chubb Trail: 65
Eureka MTB Park: 45
OT - North Trace: 27
SIUE: 27
Indian Camp Creek: 16
Rock Hollow: 10
Broemmelsiek: 3
OT - Middle Fork: 2

2022 Volunteer Hours by Type

Trail Maintenance: 2,242
Trail Construction: 1,976
Meeting: 228
Sawyer/Swamper: 107
Trail Design: 80
General Administration: 24
Ride Guide: 13
Project Administration: 12