Build - Eureka MTB Park - Trail Building Day 10-16-21

Date: Saturday, October 16, 2021 - 9am - 1pm

Location: Timbers of Eureka

Build Plans: TBD

COVID-19 & Trailbuilding: As most trail crews are small, working outside of normal exposure to the public, trail building is an inherently “socially isolated” activity. GORC believes that utilizing best practices in maintaining a hygienic and safe work site can minimize the potential of exposure to COVID-19 for volunteers and the general public.  We will require all volunteers to maintain a physical distance of 6' while working.  If that is not possible, a mask will be required.  If you feel sick or have been exposed to someone who has recently been diagnosed with COVID-19, please stay home.  We will look forward to seeing you at a future trail build.

Directions: Exit highway 44 and head south on 109. Turn left a the car wash and strip mall about a mile down.

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail.

Timbers - Proposed MTB Park map

See Who's Already Signed Up

 

Download the Schedule as a PDF

Download the Schedule as a Quarter Sheet PDF

When
October 16th, 2021 9:00 AM through  1:00 PM
Location
The Timbers
1 Coffey Park Ln
Eureka, MO 63025
Show large map

Bluff View Bike Park Campaign

-- placeholder --

Current Membership Count

Individual 403
Family 111
Lifetime 60
Business 2
Total Memberships: 576

2021 Volunteer Hours

Bluff View: 1,789
Matson Hill: 791
Greensfelder: 586
Klondike: 565
Cliff Cave: 450
Eureka MTB Park: 326
Castlewood State Park: 272
Chubb Trail: 249
Lost Valley: 192
Creve Coeur Lake: 72
SIUE: 57
Rock Hollow: 25
Broemmelsiek: 19
OT - Council Bluff: 10
OT - North Trace: 9
Shepherd Mountain: 7
Indian Camp Creek: 7
Al Foster Memorial Trail: 1

2021 Volunteer Hours by Type

Trail Construction: 3,722
Trail Maintenance: 1,368
Sawyer/Swamper: 239
General Administration: 115
Project Administration: 96
Trail Design: 75
Meeting: 66
Ride Guide: 21