Cancelled - Build - Eureka MTB Skills Park - Trail Building Day 05-08-21

 Registration is closed for this event

Cancelled due to rain

Date: Saturday, May 8, 2021 - 9am - 1pm

Location: Timbers of Eureka

Build Plans: For the work day on 5/8 9am-1pm we plan on fixing drainage issues at the kids area and working on east coast trail (drainage, reshaping, and capping with new dirt).  A couple city employees will help with a skid steer and utv to move dirt.  We would still like to use the ditch witch for shaping/building berms and some modifications to the cut above the trail to help with drainage if possible (probably better with the blade than bucket). The city of Eureka will provide lunch.  

COVID-19 & Trailbuilding: As most trail crews are small, working outside of normal exposure to the public, trail building is an inherently “socially isolated” activity. GORC believes that utilizing best practices in maintaining a hygienic and safe work site can minimize the potential of exposure to COVID-19 for volunteers and the general public.  We will require all volunteers to maintain a physical distance of 6' while working.  If that is not possible, a mask will be required.  If you feel sick or have been exposed to someone who has recently been diagnosed with COVID-19, please stay home.  We will look forward to seeing you at a future trail build.

Directions: Exit highway 44 and head south on 109. Turn left a the car wash and strip mall about a mile down.

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail.

Lunch will be provided.

Timbers - Proposed MTB Park map

See Who's Already Signed Up

When
May 8th, 2021 9:00 AM through  1:00 PM
Location
The Timbers
1 Coffey Park Ln
Eureka, MO 63025
Show large map

Bluff View Bike Park Campaign

-- placeholder --

Current Membership Count

Individual 412
Family 112
Lifetime 60
Business 2
Total Memberships: 586

2021 Volunteer Hours

Bluff View: 766
Greensfelder: 546
Matson Hill: 523
Klondike: 415
Cliff Cave: 414
Eureka MTB Park: 281
Chubb Trail: 240
Lost Valley: 167
Creve Coeur Lake: 16
Rock Hollow: 14
Castlewood State Park: 9
SIUE: 8
Shepherd Mountain: 7
Indian Camp Creek: 4

2021 Volunteer Hours by Type

Trail Construction: 2,625
Trail Maintenance: 634
General Administration: 98
Sawyer/Swamper: 97
Project Administration: 53
Trail Design: 50
Ride Guide: 3

Follow Us

Twitter Feed