Build - Eureka MTB Skills Park - Trail Building Day 03-06-21

Date: Saturday, March 6, 2021 - 9am - 1pm

Location: Timbers of Eureka

Build Plans: TBD

COVID-19 & Trailbuilding: As most trail crews are small, working outside of normal exposure to the public, trail building is an inherently “socially isolated” activity. GORC believes that utilizing best practices in maintaining a hygienic and safe work site can minimize the potential of exposure to COVID-19 for volunteers and the general public.  We will require all volunteers to maintain a physical distance of 6' while working.  If that is not possible, a mask will be required.  If you feel sick or have been exposed to someone who has recently been diagnosed with COVID-19, please stay home.  We will look forward to seeing you at a future trail build.

Directions: Exit highway 44 and head south on 109. Turn left a the car wash and strip mall about a mile down.

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail.

Lunch will be provided.

Timbers - Proposed MTB Park map

See Who's Already Signed Up

When
March 6th, 2021 9:00 AM through  1:00 PM
Location
The Timbers
1 Coffey Park Ln
Eureka, MO 63025
Show large map

Riding Freeze-Thaw Trails

Current Membership Count

Individual 408
Family 97
Lifetime 60
Business 3
Total Memberships: 568

2021 Volunteer Hours

Lost Valley: 134
Cliff Cave: 107
Klondike: 71
Bluff View: 56
Matson Hill: 20
Greensfelder: 7
Creve Coeur Lake: 4
Rock Hollow: 2

2021 Volunteer Hours by Type

Trail Construction: 374
Sawyer/Swamper: 13
Trail Design: 10
Trail Maintenance: 5
Project Administration: 2

Follow Us

Twitter Feed