Cancelled - Build - Cliff Cave - Trail Building Day 05-09-20
CANCELLED DUE TO CORONAVIRUS RESTRICTIONS
Date: Saturday, May 9, 2020 - 9am - 1pm
Location: Cliff Cave Park
Build Plans: We will be working on the Bluff Trail connector from parking lot to the river overlook. We will replace the current fall line section that climbs to the overlook. This section will be designed in a flow trail fashion with rollers and 3 bermed turns.
If time permits we also would like to give the flow section on the other side of the overlook some attention by building up the 4 bermed turns there.
Directions: From I 255, take Telegraph rd south approx. 1.5 mile to a left on Cliff Cave Rd. Follow Cliff Cave Rd approximately 1.25mi into the park. Meet at the parking lot at the top of the hill - it will be the first lot on the left.
What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail.
Lunch will be provided by the Trek Store - Arnold.
If you haven't been to Cliff Cave recently or have yet to explore the trails, this may be a great opportunity to experience all that the trail system has to offer.
Weather and trail conditions providing, bring your bike for a post build ride.
Download the Schedule as a PDF
St. Louis, MO