Build - Cliff Cave - Trail Building Day
St. Louis, MO
Date: March 16, 2019 - 9am - 1pm
Location: Cliff Cave Park
Build Plans: We will be working on a new trail on the Bluff side. It will connect the new (upper) parking lot to the existing Bluff Trail. This will establish the trail head for Bluff Trail at the parking lot. The trail will traverse some really nice topography. The design will be much like the Spring Valley Trail with some flow features similar to the recently added section of Bluff Trail.
Directions: From I 255, take Telegraph rd south approx. 1.5 mile to a left on Cliff Cave Rd. Follow Cliff Cave Rd approximately 1.25mi into the park. Meet at the parking lot at the top of the hill - it will be the first lot on the left.
What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail.
Lunch will be provided.
If you haven't been to Cliff Cave recently or have yet to explore the trails, this may be a great opportunity to experience all that the trail system has to offer.
Weather and trail conditions providing, bring your bike for a post build ride.
Download the Schedule as a PDF