Build - Greensfelder - Trail Building Day #1

 Registration is closed for this event


trail build is on. Weather is cooperating.
 

Date: March 12th, 2016 - 9am - 1pm

Location: Greensfelder County Park

What: We will be building new singletrack near where we finished last fall. We'll be reusing the Beulah ridge singletrack and heading north on the other side of the hill. The singletrack will eventually bring you out to the Scenic Overlook. This next section is 1.4 miles long, not including what we are reusing, so we need a lot of help to open this up in a reasonable amount of time. See the map below.

Where: Greensfelder Park, Allenton Rd. behind Six Flags. NOTE: Park at the Beulah Shelter located about a half mile down Scenic Loop Road - the road inside the park. Lunch will be provided at Beulah Shelter.

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail.

Lunch will be provided by St. Louis County. If you would like a vegetarian sandwich, please let us know on our forum under the "Trail Building and Maintenance Announcments" - We usually have a topic for the trail build listed.

Like all Spring trail builds, this event is worth two raffle entries for a chance to win the Origin8 Fat Bike donated by Bike Surgeon. You must be a paid member to win so make sure you take care of that situation!

See who's already registered

Beulah trail construction map

Download the Schedule as a PDF

Download the Schedule as a Quarter Sheet PDF

GORC - 2016 Spring Trail Building Schedule

Spring 2016 Trail Building Bike Raffle presented by Bike Surgeon and GORC

When
March 12th, 2016 9:00 AM through  1:00 PM
Location
Greensfelder Park- Glassberg Shelter
Eureka, MO
Show large map

Riding Freeze-Thaw Trails

Current Membership Count

Individual 295
Family 83
Lifetime 60
Business 2
Total Memberships: 440

2024 Volunteer Hours

Cliff Cave: 50
Matson Hill: 43
Creve Coeur Lake: 27
Greensfelder: 16
Klondike: 6
Quail Ridge: 4
Al Foster Memorial Trail: 3
Lost Valley: 3
SIUE: 1

2024 Volunteer Hours by Type

Trail Maintenance: 88
Meeting: 48
Trail Construction: 40
Sawyer/Swamper: 18
Trail Design: 14
Project Administration: 2