Build - Greensfelder - Trail Building Day 10-30-21

 Registration is closed for this event

Date: Saturday, 30, 2021 - 9am - 1pm

Location: Greensfelder Park, follow the signs back near the stables along Scenic Loop Road to sign in

Build Plans: We will be finishing up the Deer Run re-route started at the last trail build.  In addition, we will be putting in some posts for signage and touching a few other places up on Deer Run to call it officially completed.

COVID-19 & Trailbuilding: As most trail crews are small, working outside of normal exposure to the public, trail building is an inherently “socially isolated” activity. GORC believes that utilizing best practices in maintaining a hygienic and safe work site can minimize the potential of exposure to COVID-19 for volunteers and the general public.  We will require all volunteers to maintain a physical distance of 6' while working.  If that is not possible, a mask will be required.  If you feel sick or have been exposed to someone who has recently been diagnosed with COVID-19, please stay home.  We will look forward to seeing you at a future trail build.

Directions: Greensfelder Park, Allenton Rd. behind Six Flags. NOTE: Park at the pullout at the intersection of the park stables and scenic loop road. Or simply Follow the Gorc signs to find our meeting area!

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail.

Lunch will be provided by St. Louis County Parks.

See Who's Already Signed Up

Download the Schedule as a PDF

Download the Schedule as a Quarter Sheet PDF

When
October 30th, 2021 9:00 AM through  1:00 PM
Location
Greensfelder Park - Visitor Center Lot
Eureka, MO
Show large map

Riding Freeze-Thaw Trails

Current Membership Count

Individual 296
Family 83
Lifetime 60
Business 2
Total Memberships: 441

2024 Volunteer Hours

Cliff Cave: 48
Matson Hill: 43
Creve Coeur Lake: 27
Greensfelder: 16
Klondike: 6
Quail Ridge: 4
Al Foster Memorial Trail: 3
Lost Valley: 3
SIUE: 1

2024 Volunteer Hours by Type

Trail Maintenance: 88
Meeting: 48
Trail Construction: 40
Sawyer/Swamper: 16
Trail Design: 14
Project Administration: 2