Cancelled - Build - Eureka MTB Skills Park - Trail Building Day 05-08-21

 Registration is closed for this event

Cancelled due to rain

Date: Saturday, May 8, 2021 - 9am - 1pm

Location: Timbers of Eureka

Build Plans: For the work day on 5/8 9am-1pm we plan on fixing drainage issues at the kids area and working on east coast trail (drainage, reshaping, and capping with new dirt).  A couple city employees will help with a skid steer and utv to move dirt.  We would still like to use the ditch witch for shaping/building berms and some modifications to the cut above the trail to help with drainage if possible (probably better with the blade than bucket). The city of Eureka will provide lunch.  

COVID-19 & Trailbuilding: As most trail crews are small, working outside of normal exposure to the public, trail building is an inherently “socially isolated” activity. GORC believes that utilizing best practices in maintaining a hygienic and safe work site can minimize the potential of exposure to COVID-19 for volunteers and the general public.  We will require all volunteers to maintain a physical distance of 6' while working.  If that is not possible, a mask will be required.  If you feel sick or have been exposed to someone who has recently been diagnosed with COVID-19, please stay home.  We will look forward to seeing you at a future trail build.

Directions: Exit highway 44 and head south on 109. Turn left a the car wash and strip mall about a mile down.

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail.

Lunch will be provided.

Timbers - Proposed MTB Park map

See Who's Already Signed Up

When
May 8th, 2021 9:00 AM through  1:00 PM
Location
The Timbers
1 Coffey Park Ln
Eureka, MO 63025
Show large map

Riding Freeze-Thaw Trails

Current Membership Count

Individual 298
Family 87
Lifetime 60
Business 2
Total Memberships: 447

2024 Volunteer Hours

Cliff Cave: 48
Matson Hill: 39
Creve Coeur Lake: 27
Greensfelder: 16
Klondike: 6
Quail Ridge: 4
Al Foster Memorial Trail: 3
Lost Valley: 3
SIUE: 1

2024 Volunteer Hours by Type

Trail Maintenance: 88
Meeting: 48
Trail Construction: 36
Sawyer/Swamper: 16
Trail Design: 14
Project Administration: 2