Cancelled - Build - Chubb - Trail Building Day 02-20-21

 Registration is closed for this event

Cancelled due to snowy conditions on the ground. Look for a rescheduled date.

Date: Saturday, February 20, 2021 - 9am - 1pm

Location: Chubb Trail (West Tyson)

What: Perform required maintenance identified by GORC and St. Louis County Parks to improve the quality of Chubb Trail. Divide and conquer. Break into groups to focus on predetermined Build Zones with GORC Trail Mentors guiding the groups of volunteer builders.

Zone1
Location: From the Chubb Pavilion, just past the water bars near Lewis Rd. Details: This area had been previously started last year, but issues persist. Constant runoff and water seepage keep the area wet and muddy. Trail users have now created a reroute that needs to be prevented and closed. Adjust the existing two grade reversal rollers, de-berm some of the critical edge, and install natural stone paving.

Zone 2
Location: From the lower, Flint Quarry lot (restrooms), take the connector Trail up to Chubb and head Northeast. A very short hike from the connector to the build zone.
Details: Another area that suffers from constant runoff and groundwater running on to the tread and puddling there. Always muddy. Trail users have started going off-trail and up the hillside creating an unofficial reroute that needs to be closed. Water can be seen flowing out of the hillside in one spot. This will be trenched and continued across the trail. The drain will be filled with larger rock to help guide the water across and off the tread. Rock packing and small grade reversal roller to be installed.

COVID-19 & Trailbuilding: As most trail crews are small, working outside of normal exposure to the public, trail building is an inherently “socially isolated” activity. GORC believes that utilizing best practices in maintaining a hygienic and safe work site can minimize the potential of exposure to COVID-19 for volunteers and the general public.  We will require all volunteers to maintain a physical distance of 6' while working.  If that is not possible, a mask will be required.  If you feel sick or have been exposed to someone who has recently been diagnosed with COVID-19, please stay home.  We will look forward to seeing you at a future trail build.

Where: Meet up at the West Tyson trailhead (middle) along the railroad tracks on Allen Road at 7:30 a.m.  We will truck in pretty close to the work site.  Knock it out and get outta there.

Bring: Work boots, water and bug spray!

Lunch will be provided by St. Louis County Parks.

See Who's Already Signed Up

When
February 20th, 2021 9:00 AM through  1:00 PM
Location
Chubb Trail - Allen Road Trailhead
Allen Road
Eureka, MO 63025
Show large map

Riding Freeze-Thaw Trails

Current Membership Count

Individual 300
Family 86
Lifetime 60
Business 2
Total Memberships: 448

2024 Volunteer Hours

Cliff Cave: 47
Matson Hill: 33
Creve Coeur Lake: 21
Greensfelder: 15
Klondike: 6
Al Foster Memorial Trail: 3
SIUE: 1

2024 Volunteer Hours by Type

Trail Maintenance: 80
Meeting: 48
Trail Construction: 32
Sawyer/Swamper: 11
Trail Design: 11
Project Administration: 2