Rock Hollow - Trail Building Day #2

 Registration is closed for this event

Date: May 2nd, 2015 - 9am:1pm

Location: Rock Hollow

What: This is our last Trail Building event for the Spring 2015 season. It's been a very productive Spring but let's end with a bang!!

This is the last chance to build out Rock Hollow before the summer so whatever we accomplish will be what we get to ride until later this fall. Some come on out and let's lengthen the trail!

Lunch will be served by STLCo Parks. There is a LOT of trail to build, we hope for a good crowd. You can ride post-lunch at Bluff View or Al Foster to Castlewood, weather-permitting.

Where: Rock Hollow and Packwood Park, which will eventually be eight miles of new, multi-use trail in St. Louis County.

We are meeting at Ridge Meadows Elementary, 777 Ridge Rd, Ellisville, MO 63021. (same place we met for Build Day #1).

Directions: Take I-44 west to 109 (first Eureka exit, before Six Flags exit), then go north on 109 to Old State Rd, turn right and follow Old State Rd 2.9 miles to Ridge Rd, where you’ll turn right and then right again into Ridge Meadows Elementary parking lot (look for “Welcome, Volunteers!” sign)—we’ll meet in grassy area on south side of parking lot!

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail.

There may be a group ride afterwards - weather permitting, so bring your bike if you like.

This is the LAST (trailbuilding) chance to be entered in our raffle to win a Fat Bike courtesy of Bike Surgeon. The Last LAST chance is at our Greensfelder Challenge prep night / monthly social.

See who's already registered

Spring 2015 Trailbuilding Schedule

When
May 2nd, 2015 9:00 AM through  1:00 PM
Location
Al Foster Trail - Glencoe Trailhead
Glencoe, MO
Show large map

Riding Freeze-Thaw Trails

Current Membership Count

Individual 300
Family 86
Lifetime 60
Business 2
Total Memberships: 448

2024 Volunteer Hours

Cliff Cave: 47
Matson Hill: 33
Creve Coeur Lake: 21
Greensfelder: 15
Klondike: 6
Al Foster Memorial Trail: 3
SIUE: 1

2024 Volunteer Hours by Type

Trail Maintenance: 80
Meeting: 48
Trail Construction: 32
Trail Design: 11
Sawyer/Swamper: 11
Project Administration: 2