Build - Cliff Cave - Trail Building Day 04-02-22

 Registration is closed for this event

Date: Saturday, April 2, 2022 - 9am - 1pm

Location: Cliff Cave Park

Build Plans:  We will be building on the new section of trail that will connect the Bluff Trail with the Spring Valley Trail.

COVID-19 & Trailbuilding: As most trail crews are small, working outside of normal exposure to the public, trail building is an inherently “socially isolated” activity. GORC believes that utilizing best practices in maintaining a hygienic and safe work site can minimize the potential of exposure to COVID-19 for volunteers and the general public.  We will require all volunteers to maintain a physical distance of 6' while working.  If that is not possible, a mask will be required.  If you feel sick or have been exposed to someone who has recently been diagnosed with COVID-19, please stay home.  We will look forward to seeing you at a future trail build.

Directions: From I 255, take Telegraph rd south approx. 1.5  mile to a left on Cliff Cave Rd. Follow Cliff Cave Rd approximately 1.25mi into the park. Meet at the parking lot at the top of the hill - it will be the first lot on the left.

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail.

Lunch will be provided.

If you haven't been to Cliff Cave recently or have yet to explore the trails, this may be a great opportunity to experience all that the trail system has to offer.

Weather and trail conditions providing, bring your bike for a post build ride.

See Who's Already Registered

Download the Schedule as a PDF

Download the Schedule as a Quarter Sheet PDF

 

 

When
April 2nd, 2022 9:00 AM through  1:00 PM
Location
Cliff Cave - Upper Parking Lot
St. Louis, MO
Show large map

Riding Freeze-Thaw Trails

Current Membership Count

Individual 300
Family 86
Lifetime 60
Business 2
Total Memberships: 448

2024 Volunteer Hours

Cliff Cave: 47
Matson Hill: 33
Creve Coeur Lake: 21
Greensfelder: 15
Klondike: 6
Al Foster Memorial Trail: 3
SIUE: 1

2024 Volunteer Hours by Type

Trail Maintenance: 80
Meeting: 48
Trail Construction: 32
Sawyer/Swamper: 11
Trail Design: 11
Project Administration: 2